Established all main control point for the positioning of raft foundation. run main vertical control point from DM benchmark to site location.
| Project | Dubai International Financial Centre |
| Scope of the work | Raft Foundation & run main vertical control point |
| Client | Taminiyat |
| Main Contractor | Dubai contracting company |
| Consultant | Atkins |
| Works done | Established all main control point for the positioning of raft foundation. run main vertical control point from DM benchmark to site location |
Copyright © 2021 Accurate Survey Works L.L.C
Optimized By GeNext