Established all main control point for the positioning of raft foundation. run main vertical control point from DM benchmark to site location
Project | Grosvenor House & Apartment |
Scope of the work | Raft Foundation & run main vertical control point |
Client | Dubai Holding |
Main Contractor | Samsung |
Consultant | HOK |
Works done | Established all main control point for the positioning of raft foundation. run main vertical control point from DM benchmark to site location |
Copyright © 2021 Accurate Survey Works L.L.C
Optimized By GeNext