Established all main control point for the positioning of raft foundation. run main vertical control point from DM benchmark to site location
| Project | Grosvenor House & Apartment |
| Scope of the work | Raft Foundation & run main vertical control point |
| Client | Dubai Holding |
| Main Contractor | Samsung |
| Consultant | HOK |
| Works done | Established all main control point for the positioning of raft foundation. run main vertical control point from DM benchmark to site location |
Copyright © 2021 Accurate Survey Works L.L.C
Optimized By GeNext