Dubai Pearl Residence Tower

Establishing control station, Bench mark, Topographical survey, Producing Drawing, Take out for cut and fill of earth works, Checking and recording of final grading levels, volume calculation, Grid line set up.

OCTOBER 5, 2015 BY NORTHERN ENGINEERING SURVEYS L.L.C DUBAI

Project Dubai Pearl Residence Tower C2 & C3
Scope of the work Topographical survey
Client Dubai Pearl Residence
Main Contractor SWISS BORING
Consultant Hyder Consultant Engineering
Works done Establishing control station, Bench mark, Topographical survey, Producing Drawing, Take out for cut and fill of earth works, Checking and recording of final grading levels, volume calculation, Grid line set up.

Get In Touch with Us Easy

Contact Us