Team has provided control survey for both horizontal and vertical relative to the external control points. Island moment control and exoskeleton primary control points.
| Project | Burj Al Arab Hotel | 
| Scope of the work | control survey, Island movement control, exoskeleton primary control points | 
| Client | Emaar | 
| Main Contractor | Samsung Besix and Arabtec | 
| Consultant | MAXBRAID Surveyor | 
| Works done | Team has provided control survey for both horizontal and vertical relative to the external control points. Island moment control and exoskeleton primary control points. | 
Copyright © 2021 Accurate Survey Works L.L.C
Optimized By GeNext
